Phase 5 - Wiring & Control

Phase 5 Planned Finish: Fall 2008

As of Feb 2008 only the staging trackage actually wired and operational. However, the architectural concepts and basic strategies have been worked out will simply be extended to the Visible Trackage as it is built in Phase VI. Here is the Phase 5 Photo Journal showing the various intermediate steps of construction during this phase. Photos and detailed schematics will be added as design and implementation proceeds. Drawings and photos are "thumbnails" by default. To view a larger image or to print simply click the image and a full PDF version will appear. WARNING: Some of these images are very large (over a megabyte) and may take time to download.